blog

How Long Does Solar Panel Installation Take?

Solar panel installation for commercial properties in Sacramento and neighboring areas is a multi-step process that typically takes between one week and several months, depending on various factors such as system size, permitting, and project complexity. The actual on-site installation—the time spent mounting the panels and related equipment—is often completed in just a few days. However, the entire process from initial consultation to system activation can be much longer due to planning, approval, and inspection stages.
In this article, you’ll discover the key phases of commercial solar panel installation, the major factors that affect how long it takes, and why the wait is often worth it for businesses seeking energy savings and sustainability.

Key Takeaways

Understanding the Solar Panel Installation Timeline

If you are wondering how long solar panel installation takes, the answer is that it depends on several factors. For a typical commercial building, expect the process to unfold like this:

Initial Consultation & Planning (2-4 weeks)

The solar panel installation journey begins with an initial consultation and planning phase, typically taking two to four weeks. During this stage, your solar provider will assess your property’s energy needs, roof condition, and utility usage to design a new solar panel system tailored to your commercial building. Detailed site assessments and energy audits are common, and proposals are refined based on client goals and building specifications. This planning period is crucial to ensure the new solar panel system aligns with your budget, energy output expectations, and long-term sustainability goals.

Permitting and Approvals From Local Government (2-8 weeks)

Once planning is complete, the next step is securing the necessary permits and approvals, which can take two to eight weeks. This phase involves submitting designs to local authorities to confirm compliance with zoning laws and building codes. It also includes plan reviews by certified solar engineers who validate system safety and performance. Delays can occur depending on the municipality’s review speed and documentation requirements, making this a highly variable yet essential part of the timeline.

Equipment Procurement and Scheduling (A Few Weeks)

After permits are granted, the solar provider will order all necessary equipment, which may take a few weeks, depending on the supplier’s timelines. This includes sourcing components for your solar power system, such as a solar inverter and mounting hardware. Whether you are installing rooftop solar systems or home solar panels on a commercial building, timing can be affected by supply chain disruptions or manufacturer backlogs. Once all solar equipment is secured, the provider will schedule your installation based on crew availability and site readiness.

On-Site Installation (2–10 days)

The solar installation process itself is typically the fastest stage, lasting between two and ten days, depending on system size and roof accessibility. Technicians will begin by securing mounting hardware and putting solar panels in place according to the pre-approved design. Electrical wiring, inverter connection, and safety checks are also completed during this phase. While this portion of the project is quick, weather conditions and unforeseen roof complications can extend the timeline slightly.

Inspection and Utility Connection (1-4 weeks)

After having your solar panels installed, you must prepare for a final inspection and be connected to the grid, a process that takes one to four weeks. Local inspectors will ensure the system meets all building and electrical codes, while utility companies review the setup and install net metering or other interconnection infrastructure. Approval times vary by region, but this step is vital to activating the system and beginning to generate clean energy from your solar investment.
In general, timelines can vary based on the size and complexity of the solar system, the permitting process and local utility requirements, equipment availability and supply chain delays, and the experience and schedule of your solar provider. Understanding these variables helps set realistic expectations and smooth the path to a successful installation.

Solar Panel Installation Process

Selecting the right provider is the first step in ensuring a smooth and timely process. Look for companies with proven experience, a commitment to local permitting standards, and a transparent communication process. Choose Solace Enterprises for your solar energy project.
A detailed site assessment includes evaluating your roof, available land, electrical infrastructure, shading analysis, and structural considerations. This visit helps shape the eventual system design and timeline.
Expert design and engineering ensure your solar array meets both your energy needs and code requirements. Depending on complexity, this phase often overlaps with site assessment and takes a few weeks.
Permitting can be the most unpredictable part of the process. The solar installer will submit designs to the city or county for approval. In Sacramento County, this phase may take anywhere from a couple of weeks to several months, depending on the project scope and municipal workload.
Once permits are in hand, panels, inverters, and racking systems are ordered. Delivery times can vary, especially during high demand or supply chain disruptions. Scheduling the installation crew is the final planning step before work begins.

The actual onsite installation is often the shortest segment, typically lasting 2 to 10 days for most commercial properties. This involves mounting panels, installing electrical systems, and integrating with your building’s infrastructure. The onsite installation is usually completed within a week for a mid-size commercial property. Larger or more complex systems may require additional days, especially if roof reinforcements, electrical upgrades, or specialty equipment are involved.

After installation, a city inspector must verify that the system complies with local codes and safety standards. This inspection is typically scheduled within a week or two of installation, but may be delayed by municipal backlogs.
Once the city inspection is passed, the local utility reviews the system for grid interconnection. Utilities require final paperwork before granting Permission to Operate (PTO). This step can take from a few days to several weeks.
With PTO in hand, your solar panels can be switched on. At this stage, your commercial property starts generating clean energy, and utility bills begin to drop.

Factors Affecting Solar Installation Timeline

Larger installations with hundreds or thousands of panels or unique architectural features naturally require more planning and labor. Complex electrical systems or multi-roof arrays can add days or weeks to the timeline.

Different municipalities in the area have their own permitting processes. Extended review periods, additional documentation, or zoning variances can all introduce delays. Staying proactive and responsive during this phase helps minimize holdups.

Testing, adjusting, and balancing (TAB) is a critical phase in commissioning an HVAC system. Technicians test system components, change settings, and balance air and water flows to meet design requirements. This ensures that all building areas receive appropriate heating or cooling.

Global supply chain issues have affected solar panel and inverter availability in recent years. Delays in shipping or product shortages can push timelines back. Working with an experienced provider who can navigate these challenges is crucial.

The demand for commercial solar systems in Sacramento County is growing. Top installers may have packed schedules, so booking early can ensure your project starts as soon as possible.

Is Solar Installation Worth the Wait?

The long-term rewards can far outweigh the initial wait. Solar systems deliver:
Over time, these advantages translate to financial savings and a stronger brand reputation.

The solar payback period—the time it takes for your energy savings to cover initial installation costs—typically ranges from 5 to 10 years for commercial properties in Sacramento and surrounding areas. After this period, ongoing energy generation can mean decades of reduced or eliminated electricity bills.

Getting Started on Your Solar Journey

If you are considering a solar system for your commercial property, the first step is a professional assessment. Our solar company, Solace Enterprises, offers comprehensive site evaluations, custom system designs, and seamless project management to ensure your solar installation is efficient and cost-effective. Our expertise in navigating local permitting and utility requirements means your project will progress as quickly as possible, delivering the benefits of clean, renewable energy with minimal hassle.

Conclusion - How Long Does It Take to Install Solar Panels?

While it is natural to wonder, “How long does solar panel installation take?” the answer depends on several factors unique to your commercial property and local processes. The journey typically spans 2 to 6 months, with the actual installation taking 2-10 days. The long-term financial and environmental benefits make solar systems installed in proper places a wise investment for businesses ready to embrace energy independence.